31 Woodbine Business Park, Hewitsland, New Ross, Wexford, 

Case study

Reduction in Electricity bills

0 %
GoogleReviews
BASED ON OVER 150+ REVIEWS

The Issue

Langtons Hotel faced significant challenges with the rising costs of electricity, which directly impact its operational expenses and overall profitability. One of the primary difficulties is the increased financial burden, as higher electricity bills can strain budgets, particularly for an establishment that operates large facilities with extensive lighting, heating, cooling, and laundry services.

Langtons Hotel Kilkenny

The Fix

The installation of PV (photovoltaic) solar panels by EnergyServ has significantly addressed the challenges Langtons Hotel faces with rising electricity costs. By harnessing solar energy, the hotel now generates a substantial portion of its own electricity, which reduces reliance on the grid and leads to lower electricity bills. This shift to renewable energy alleviates the financial burden associated with fluctuating and rising energy prices, providing more stable and predictable energy costs, which simplifies budgeting and financial planning.

The Result

The initial investment in solar panels, facilitated by EnergyServ, is mitigated by the long-term savings on energy bills. Additionally, EnergyServ likely assisted Langtons Hotel in taking advantage of available incentives, tax breaks, and grants aimed at promoting renewable energy adoption, further reducing the upfront costs.

EnergyServ’s installation of efficient solar technology also supports Langtons Hotel in meeting regulatory requirements to reduce its carbon footprint. By transitioning to a cleaner energy source, the hotel not only cuts costs but also enhances its environmental sustainability, which can improve its reputation and appeal to eco-conscious guests.

Moreover, the energy-efficient solutions provided by EnergyServ, such as integrating smart energy management systems, ensure optimal use of the generated solar power, maximizing efficiency and further reducing operational expenses. Overall, the partnership with EnergyServ has enabled Langtons Hotel to adopt a sustainable energy strategy that addresses cost concerns while promoting environmental responsibility.

Langtons Solar Panels Infographic

WHAT WE DID

The process from initial client consultation to the installation of solar panels typically involves three key stages:

01

Consultation and Assessment

EnergyServ engaged with the Langtons to understand their energy needs, goals, and budget. We conducted a thorough assessment of the property, including an analysis of current energy usage, roof space, orientation, and structural integrity. We also discuss potential savings, financing options, and any available incentives or rebates. This stage ends with a customised proposal outlining the benefits and costs of the solar installation.

02

System Design and Permitting

Once Langtons agreed to proceed, EnergyServ design a solar energy system tailored to the Langtons specifications and energy requirements. This includes selecting the appropriate type and number of solar panels, inverters, and other components. EnergyServ then handles all necessary permitting and approvals from local authorities and utility companies. This stage ensures that the installation complies with all regulations and standards.

03

Installation and Activation

After securing the necessary permits, the installation team schedules and carries out the physical installation of the solar panels and associated equipment. This includes mounting the panels, wiring the system, and connecting it to the electrical grid. Once installed, the system undergoes a series of inspections and testing to ensure it operates correctly and safely. Finally, the system is activated, and Langtons Hotel is guided on how to monitor and maintain their new solar energy system.

PRODUCTS WE USED

Here are the products that EnergyServ used to deliver the solution
 

JA Solar 545w (238 panels)

Solis Inverter

Zappi EV Box Business x2